The Congregation did reach a consensus on the placement of the panels on the south face of the Church. The ten panel system will be mounted, five to the right and five to the left of the window and statue of Jesus. The upper edge of the panels will be approximately level with Jesus’ feet. This placement of the panels lower on the building allows us to install a slightly larger system at the same cost as the original estimate received last fall.
The congregation also supported installing a wireless personal display to be mounted in the Narthex. This display will allow us to see how much electricity we are generating and track our cumulative savings over time. A mock up picture and system specific information is available in the Church Office. Thanks again for all the support for this ministry to our environment and Our Saviors. Walt Chossek